REFERENCE

PROGRAM MANAGER: ING.EUGEN MIHALCEA
ü Studies for the uniformization of methods and equipment used in preventive measurements implemented on PE 116
ü Technical norms for the energy capacity protection and safety zones
ü Comutation equipment on-line monitorization and diagnostic sistem
ü Procedure for unitary aproach (on a national and state level) on necessary documentation for obtaining acords and environment authorizations for the CN TRANSELECTRICA SA objective gestion
ü Study for the diagnostic of high voltage switches by using sound print and oil pressure variation
ü Electrical and magnetic field measurments in the vecinity of high voltage power lines
ü The simulation of shortcircuit curents in diverse tranzitory regions at generator gages in CHE, necessary for the elaboration of a unitary strategy in choosing switches
ü Review PE 111/1-12-Instructions for conexion and substation design
ü Review PE 116/1994-Trial and profilactic measurement norms for electrical equipment and instalations
ü The computation of shortcircuit curents on the bars of 220,6 and 0.4 kV stations, as well as the analysis and tunning setting and projection coordination at SE Craiova –CET Isalnita
ü Shortcircuit section computation for projects on station bars and LEA from 400/220/110 kV TRANSELECTRICA instalations
ü Review PE 101 A –Instructions for the setting of quota distances of electrical instalation placement with over 1kV in comparison with other constructions
ü Review PE 017-Regulations for eploatation Technical documentation
ü Non-retehnologizating stations maintenance strategy in corelation with the optimum scheme and with the maintenance assurance programe
ü Maximal maintenance paper for swithces in RET
ü Electrical rotative masines state investigation through partial download measurement
ü The on-line and off-line diagnostic of comutation equipment in hidroelcetric power stations
   
PROJECT MANAGER: ING.COSTIN PARVULESCU
  CONSULTANCE
ü Hydropower arrangement of the Jiu river in the Livezeni-Bumbesti sector
   
  DESIGN
ü Fezability study, technical project as well as task note for the hidroenergetic arrangement of Bumbesti –Livezeni
ü Fezability study for the hydro power plant Tarnita-Lapustesti
ü Metalic structure design of the boiler room at CET Braila
ü Metalic structure design for the CET Timisoara station
ü Metalic structure design for the chimney Oradea
ü Metalic structure design for the command tower at Portile de Fier
   
  TECHNICAL ASSISTANCE –at the hydropower arrangement of the Jiu river in the Livezeni-Bumbesti sector
 
GEOTEHNIC AND HIDROGEOLOGIC STUDIES DEPARTMENT
DOCUMENTATIONS: STUDIES, EXPERISE, QUOTAS
ü Geologic technical assistance at:
CHE Motru Tismana , AHE Poiana Marului-Ruieni-Poiana Rusca the fall of Alb river, AHE Surduc Siriu, AHE Raul Mare Retezat , Arrangement for Crisul Repede river, AHE Sebes Galceag and Sugag Alesd Fughiu sector, AHE a.r Siret Cornesti Movileni sector, AH Dragan, AH Rastolita, AH Runcu Firiza, AHE a.r Bistrita Borca Poiana Teiului sector
 
ü AHE a.r Dmabovita Satic Dragoslavele sector,AT Maneciu-Valenii de Munte, AHE Cerna, AH Olt Fagaras Hoghiz Belareca dam Cornereva sector, AHE Baleia foroiling with the excess water of CTE Paroseni, AHE Strei-Che Plopi, AHE Lotru Ciunget
ü Permanent geological AT for AH a r Jiu Livezeni-Bumbesti sector
ü Geologic Technical assistance at:
AHE SURDUC-SIRIU, AHE SEBES GALCEAG SI SUGAG, AHE Raul Mare Retezat-CHE Raul Mare Retezat, AHE Strei, CHE Plopi, CET Anina , Dam and acumulation, Arrangement for the Crisul Repede river, Alesd-Fughiu sector
ü Permanent geologic technical assistance –AHE Bistra-Poiana Marului-Ruieni-Poiana Rusca, AHE Cerna –Belareca
ü AHE on sector Cornetu –Avrig river Olt. Permanent technical assistance at AHE Cornetu –Avrig river Olt
ü AHE on sector Fagaras Hoghiz river Olt. Permanent technical assistance at AHE Fagaras Hoghiz river Oltz
ü CHE Cerna-Motru –Timisoara Et II. Permanent technical assistance for the secundary captation Bistricioara
ü AHE on Valea Sadului-Vadeni sector, river Jiu.Technical geologic assistance for the closure degree of DMS and DMD from CHE Curtisoara in the year 2005 and 2006
ü AHE on Cosmesti Movileni sector,river Siret.CHE Movileni. Technical geologic assistance at AHE on Cosmesti Movileni sector,river Siret
ü Safety degree upgrade of SEN through retrofitting of the 400kV Cernavoda station. Technical assistence for the approval of the foundation terrain and other conexe activities
ü Technical geologic assistance for LEA 400kV Oradea-Nadab-Bekescsaba
 

ELECTRIC POWER STATIONS, GRIDS AND STATIONS,ELECTROMECANIC EQUIPMENTS,DISTRICT HEATINGS DEPARTMENT

ü Local power frequency adaptor project at CHE Tismana
ü The modification of the local RAFP instalation in CHE Vidraru for introducing a secundary regulator and a HA 2 with a modernized regulator. Testing for determining the tunning performances of hidroagregates(10 grups)
ü Execution PT and assembly for the placement of hidraulic cuples in the district heating instalation at CET Grozavesti, CET Vest and CET Progresul, in order to realize continuum tunning of thermal agent parameters in the city’s thermal grid
ü Fezability study –Modernization of thermal grid, agent and hot water grid for definitive Colony SHEN Portile de Fier II
ü FS for the rehabilitation of CET SUFLANTE Calarasi
ü Technical project, task note and surrounding execution details for providing utilities (water, district heating, tehnological steam, cooling water, auxiliary cooling water, gage circuits at the 6 kV supply, interior sewerage, diesel depo, drinkable water and fire hazard) for the investment objective: expansion of the district heating plant Bucuresti Vest with modern cogeneration units
ü PT on repairs of the district heating pipes in the Nord area of Pitesti, between Gara Nord (F*) and fixed point F10
ü PT on repairs of the district heating pipes 2xDn600+1xDn800 Bascov between pipe lanes C4 and C5 and PT for the transformation of a horizontal compensator in a vertical one on Stefanesti 2xDn250+1xDn400 on Depozitelor Street
ü The modernization of secundary tunning sistem at SE Braila
ü PT for the rehabilitation of the primary return pipe 1xDn800 (underground portion) on Campineanu Str. Between pipe lane C9 and the point of underground entry (entry expo park)
ü District heating fine tunning at PT 11 Malu Rosu ,Ploiesti
ü Technical assistance and final documentation (AS-BUILT)for modernization projects on the thermal agent and hot water distribution thermal grid in the PDF II colony
ü Technical Project for the modernization/rehabilitation of the primary thermofication network between pipe lane C2(CET Gavana)abnd C6 District heating Pitesti
ü Technical Project for the modernization of the primary thermal network between C20 –Publitrans Craiovei station
ü The repair and placing back into operation of the torque regulator at HA nr 2 CHE Motru
ü Raising energetic efficiency at SC TRANSGEX Oradea through producing energy from a geothermal source.Fezability study
ü Performance and service qualification trials on RAV sistem
ü Qualification trials of RAFP istalations and instalation project RAFP at CHE Bradisor
ü Technical project elements for the modernization of the burning sistem in boiler nr 2 CET Pallas Constanta. Steam circuit. Documentation for Pipe Book with ISCIR visa
ü The expertise on the speed regulator (HA-1 )at CHE Candesti
ü Fezability study for: the modernization of instalations in the solidoil compound for the increase of efficiency at SE Craiova
ü Replacing the combined burners at boilers 2A and 2B surrounding energetic group nr 2, 210MW with new performant burners in a new solution and with this implementing BMS in corelation with the existing DCS
ü Technical project for the modernization and rehabilitation of thermal agent warming pipes, a.c.m, recirculation through replacing clasic pipes with preizolated pipes and the purchase and assembly of thermal modules and surrounding instalations-PT 517
ü Determining the performance of tunning grups form interconectation –nr 5 goupe Deva
ü Automated frequency tunning-power at CHE Lotru, CHE Stejaru, CHE Vidraru, CHE Galceag
ü The modernization of the automated speed tunner at CHE Lotru , CHE Stejaru , CHE Susag
ü The development of the local frequency repartitator – power at FE Rovinari
ü Depoziting tehnology of thermalpower plant ash in the mining sistem, and interdisciplinary program
ü The management and marketing of ash. Pilot construction material producing station FE Govora
ü Dry air turbine conversion instalation
ü Vibration measurement and analysis tehnology for vibrodiagnostication, using proximity translators for turbine ansemble-generator 330 MW
ü Specific criteria and data base for vibrodiagnostication of the 200 MW turbine
ü Study for the emprovement of prewarming and water degasing instalations at CET-Palas-On-line district heating instalations surveilance sistem
ü Burning instalations with dust focusers at 420 t/h boilers nr 1 and 2 at CET Brasov
ü Adaptation study on CT Calafat profileat real thermal energy consumption with possibility of oil replacement analysis
ü Study for download duration compression of oil wagons in thermalpower plants
ü Solution study for the assembly of a pump station for water recirculation at CAF in CET Bucuresti-Sud
ü Prefezability study for the rehabilitation of level A3 of blocks 3 and 6 330MW at CTE Turceni
ü Task note for the execution and assembly of the burn instalation with dust focusers at nr 1 boiler 420 t/h at CET Brasov
ü Tehnological engineering as well as Technical consultancy at function trials of nr 3 420 t/h boiler at CET Progresu
ü Execution and assembly project for fluid combiners with different temperatues at CAF type 8A nr 1 at CET Bucuresti Sud and nr 5 at CET Grozavesti
ü Engineering papers for the modernization of boilers PK-38-2 at FE Paroseni
ü Gaz and oil supply instalation of boiler nr 5 CPG 420 t/h at FE Pitesti
ü Technical consultancy for the turbine projection tunning sistem of 220 MW TA1 at FE Rovinari on placing into function after RK
ü Proximity measurement translator at bearing nr 1 of a F1C 330 MW turbine
ü Vibration measurements at TA3 FE Rovinari
ü Engineering activities, technical assistence and consultancy in energy equipments field for the rehabilitation program for grups nr 5 and 6 FE Turceni
ü Study for the usage of variable turation actions on internal electrical plant function
ü The modernization of steam boilers 4x10 t/h at CTP Turceni in view of gaz and oil function with high sulf compound
ü Consultancy papers in the A2 CTE Rovinari blocks 5 and 6 program
ü Fezability study –RK boiler 420 t/h CET Borzesti
ü The function of energetic block nr 7 and 3 ,330 MW at CTE Turceni
ü Waranty trials at the 200 MW energetic blocks in CET Rovinari and CTE Doicesti
ü Exploitation instructions for 1035t/h boiler
ü Exploitation instructions for 420 t/h boiler
ü Exploitation instructions for F1C-330MW turbine
ü Exploitation instructions for DSL-50MW turbine
ü Setting the pollution level in the following areas:CTE Mintia,CT Gura Barza,CET Paroseni,CTE Brazi,CET Pitesti,CTE Doicesti,CET Oradea
ü Technical project and solution for the conversion of steam boilers 30 t/h at SE Iasi /UTU Vaslui, from cole functioning ones to fosileoil
ü Technical project and solution for the conversion of steam boilers 50 t/h at CPL Drobeta Turnu Severin, from cole functioning ones to fosileoil
ü Technical project and solution for the transformation of steam boilers at CT Gura Barza into hot water boilers
ü Case study and solution for the introduction of steam (hot water) warmers at CAF 100Gcal/h at SE Constanta
ü Case study, solution and Technical project for an improved version of a dust cole burner at boiler nr 1 420 t/h at SE Brasov
ü Research for the surveilance and analisis of poluting effects caused by energy transport instalations
ü The on –line /off-line diagnostic of the comutation tool in hidroelectric power stations